Realization of n. 1 Operating Complex consisting of n. 2 operating rooms, n. 2 rooms for patient preparation, n. 2 rooms for surgeons preparation, n. 2 rooms for awakening patients and an environment for sterilization. All the rooms have been covered with porcelain steel panels, conductive PVC flooring, suspended ceiling seal, electrical system, including the complete supply of equipment necessary at the beginning of the operating activity, such as surgical lights, operating tables, electrosurgical units, anesthesia machines, monitors, autoclaves.
Realization of n. 2 operating rooms with walls in painted and stainless steel medical gas plant. Supply of stainless steel furnishings and surgical lights.
Realization of n. 1 Operating Room with painted and stainless steel wall covering medical gas plant. Supply of stainless steel furnishings and surgical lights.
Realization of n. 2 operating rooms with porcelain steel wall cladding, construction of medical gas and false ceiling systems with sealed panels, as well as supply of surgical lights, electrosurgical units and closet type operating room furnishings built-in showcase, technical wall with catgut holder, clock, X-ray film viewer, interlocked dirt handling and various equipment.
Realization of n. 2 operating rooms with painted stainless steel wall cladding, construction of a medical gas system, supply of stainless steel furnishings such as a cabinet for showcase recessed, technical wall with catgut holder, clock, X-ray film viewer and various equipment.
Realization of n. 2 complex compound operators, first one with n. 5 operating rooms, and the other one with
n. 2 operating rooms, with local annexes for surgeon preparation, patient preparation, patient awakening with supply and installation of painted stainless steel panels, flooring, false ceiling with waterproof panels, operating room furniture, surgical lights, electrosurgical units and medicinal gas power plants according to EC standards. The gas plant medicines, in addition to the operating rooms, has been extended to the entire hospital for 400 places bed.
Realization of n. 1 peacemaker room with wall sealing and coating with painted stainless steel panels, flooring, false ceiling with sealed panels, construction of medical gas system, supply of stainless steel furnishings.

Structural, plant engineering and sanitation adaptation of the complex operating department of Obstetrics and Gynecology, supply of stainless steel furnishings, walls in porcelain steel, wall units for anesthesia, flooring and false ceiling.

Completion works with the construction of the third operating room of Surgery, with the supply of a medical gas plant, flooring, false ceiling with sealed panels, stainless steel furnishings, porcelain steel paneling, surgical lights, anesthesia wall units.
Supply and installation of n. 1 Operating Complex consisting of n. 10 Operating Rooms and n. 1 Operating Complex consisting of n. 2 Operating rooms for obstetrics and gynecology with supply of covering for the operating room with porcelain steel panels, flooring and false ceilings, stainless steel furnishings, manual and automatic sliding doors, medicinal gas system.
Construction of a medicinal gas distribution system.
Recovery, renovation and maintenance work, consisting of the construction of a medical gas plant, supply of operating room furnishings, suspended ceilings, sliding doors with automation, at the Anesthesia and Resuscitation department.
Construction of a new medical gas system for the whole complex, construction of n. 1 Operating Complex at the operating room of Gynecology and First Aid restructuring and Analysis Laboratory.
Realization of a medical gas plant at the Division of First Medicine and supply of bed head beams.
Realization of a medical gas plant.
Realization of n. 1 Operating Complex complete with medicinal gas system, air conditioning and air conditioning. Supply of operating room equipment and coating of porcelain steel walls.
Realization of technological systems, electrical system and medicinal gas system at the Operative Unit for palliative care for terminally ill patients.
Realization of medical gas systems for the functionalization of medical clinics, the Gastroenterology service and the senology service.
Realization and adaptation of medical gas plant and supply of stainless steel furnishings at delivery rooms.
Realization and adaptation of the medical gas plant at the operating rooms, supply of steel furniture, false ceiling, ceiling lights and electrical system adaptation for n. 2 operating rooms.
Renovation of two rooms of the operating block, installation of sliding doors with manual movement, two-seater surgeon washbasins, dirty walk-in closet module, equipped walls and technical cabinet; construction of medical gas plant and supply of bed head beams.
Supply, installation and overhaul, turnkey, of the air conditioning systems serving the operating rooms of the hospital.
Realization of a medical gas plant in the new First Aid hall, Reception, Medical Surgical and Outpatient Emergency, Intensive Care and Operating Block.
Realization of medical gas plants as part of the completion works of the New Lentini Hospital. Realization of shielding protections (anti-x walls, anti-x visual and anti-x doors) inside the rooms intended for the imaging department of the new hospital; supply and installation of automatic sliding doors, and PVC coatings.

Turnkey construction of Operating Block consisting of n. 3 operating rooms, preparation rooms, recovery rooms, sterilization rooms, changing rooms, depots, head nurse room, doctors room, sterilization, operand stop, changing rooms, dirty corridor, clean corridor, supply of dedicated electromedical equipment and technical furnishings. Coating for internal walls of operating rooms made with Corian panels, conductive PVC flooring, sealed false ceiling, including the supply of equipment necessary for operating activities, surgical light, built-in technical cabinets, equipped wall, sterilization center, anesthetic gas monitoring, patient transfer system, filtering ceiling for operating room with ISO 5 air contamination class.

Realization of air conditioning systems, electrical system serving the air conditioning system, sanitary water system, medical gas system, fire prevention system.
Realization of medical gas system, supply and installation of sliding doors also automatic with external Corian claddings.
Realization of research laboratories with enclosure including structural construction works for an underground elevation and three elevations above ground and complete construction works and technological systems.
Turnkey construction of operating complex including n. 4 operating rooms and sterilization rooms.

Realization of n. 1 Operating block, turnkey, consisting of n. 3 operating rooms, patient preparation rooms, surgeon preparation rooms, awakening rooms, staff rooms, sterilization center and supply of all electromedical devices to provide the complete work use. Coating with porcelain steel panels, conductive PVC flooring, sealed false ceiling.

Realization of n. 1 an operating complex consisting of n. 5 operating rooms, patient preparation rooms, surgeon preparation rooms, awakening rooms, staff rooms, sterilization center and supply of all electromedical devices to give the complete work to the use.

Design and execution of the completion of the Sterilization department for the research laboratory with enclosure in the Municipality of Viagrande.
Realization of mechanical, HVAC and fire prevention works for the Tygacil project.
Construction of a surgical clinic including n. 1 Operating Complex consisting of n. 1 operating room and annexed rooms.
Realization of n. 1 operating block consisting of 3 operating rooms. All the rooms have been covered with painted steel panels, conductive PVC flooring, sealed false ceiling, electrical system, including the complete supply of the necessary equipment at the beginning of the operating activity, such as surgical lights, operating tables, electrosurgical units, anesthesia, monitor, autoclaves.

Remaking of the electromechanical fire safety management system at the “Umberto I di Torino” hospital.

Adjustment and restructuring works of the operating block of the “Moscati di Aversa” hospital. Design and construction of n. 1 operating block consisting of 3 operating rooms. All the rooms have been covered with painted steel panels, conductive PVC flooring, sealed false ceiling, electrical system, including the complete supply of the necessary equipment at the beginning of the operating activity, such as surgical lights, operating tables, electrosurgical units, anesthesia, monitor, autoclaves.
Realization of the renovation of Building Utilities 33/55. The works include all the construction and plant engineering parts including the supply of refrigeration units and medium voltage cabin.
Supply of n. 2 operating rooms c / o the Urology department of the Policlinico “P. Giaccone ”in Palermo, with a“ turnkey ”formula. All rooms have been covered with stainless steel panels, conductive PVC flooring, sealed false ceiling, including the complete supply of equipment and furnishings necessary at the start of the operating activity, such as surgical lights, operating room wall units, surgeon washbasins , X-ray viewers, seconds counter and dirt-handling module.
Realization of finishing works and systems related to the operating block of the nursing home and construction of the production and / or storage centers for medical gases, backbones external and external uprights and external sectioning panels.
Supply of civil works (prefabrication), plant engineering and furnishings useful for the construction of no. 14 Operating Rooms provided for in the Nuovo San Marco Hospital in Librino, Catania. All operating rooms were built with panels with a mineral solid surface finish (Corian type), while the adjacent rooms were built with HPL laminate panel finish.
Realization of an Innovative Radiotherapy in the municipality of Viagrande as part of the project related to the structural strengthening of a network of excellence for preclinical research on personalized therapy in oncology and regenerative medicine, a project finalized by the ministry of education of the university of research.
Remaking of the hospital unit “G. Di Cristina” in Palermo and construction of 2 operating rooms and Day Surgery with painted steel medical walls.
Construction work for an operating room at the U.O. of Obstetrics and Gynecology of the San Martino hospital unit.